Hynamics joins forces with ABB to reduce the cost of hydrogen

Hynamics ABB hydrogen
Hynamics joins forces with ABB to reduce hydrogen cost

The EDF subsidiary has signed an agreement with ABB to optimise hydrogen production costs. The Optimax system has already been installed at the Auxerre filling station and other deployments will follow. 

It is only now being revealed at the Hyvolution trade fair, but Hynamics has concluded an agreement with the ABB group to test an energy management system (ABB Ability Optimax for green hydrogen). This system optimises production costs, from simulation to operation, by processing data (e.g. electricity prices, energy consumption) in conjunction with the cloud. The reduction can be up to 16%. 

The tool was installed at the Auxerre station last November. This site supplies the first 5 H2 buses of the Local Environmental Observer (LEO) Network, with an electrolysis capacity of 1 MW.  

Hynamics will be able to control this system from its operations centre and plans to install it on other hydrogen production sites later this year. 

PS: You can sign up to our newsletters to follow the latest hydrogen news on a more regular basis:
– “
Your hydrogen news live” (to receive all our articles as soon as they are published)
– “
Your weekly newsletter” (sent every Monday morning).

Are you a LinkedIn user who would like to follow the latest hydrogen news on a more regular basis? Then our LinkedIn weekly newsletter may be what you’re looking for. You can subscribe to it here

Article written by Laurent Meillaud and translated by Logan King

If you liked it, share it

About the author

Picture of Laurent Meillaud

Laurent Meillaud

Freelance automotive journalist and consultant, author as well, focused on technologies and new trends for more than 30 years, convinced that hydrogen is one of the energies for the future.

Our latest articles